Miranda Coal: Updated CPR on Uithoek Project and further Progress Report

Further to the SENS announcement dated 14 May 2008, which detailed the first four independent Competent Person’s Reports (“CPRs”) on the group’s KwaZulu Natal (KZN) coal projects, the board today provides the following update.

* The in-fill drilling program on the Uithoek property is complete and an updated CPR(1) was issued.

* The Uithoek coal prospect already carried a “Measured Resource” SAMREC code classification for multi-seam deposits and additional drilling has supplemented the coal qualities database, provided more washability data and allowed for additional coking coal analysis.

* The CPR identified two products; a primary 12% ash content product, which hosts the coking coal and a middlings product of 22 Mj/kg for local power station use.

* Coking coal properties have been identified in the open-pitable sections of the Top Seam as well as the open-pitable Block 1 of the Bottom Seam.

* The total yield on the open-pitable Top Seam sections is high and ranges from 82% to 92%, with the total yield on the Bottom Seam’s open-pitable Block 1 an acceptable 65%.

* All open-cast sections on the project, including the Bottom Seam’s Block 2, as well as the Bottom Seam’s Underground Block, with a 77% yield, are suitable for power station use.

* The updated resource statement (all Measured Resources) for Uithoek is given below:

Area Resource
 (‘000 m2) 
  Volume  
(‘000 tons)  
   Resource   Gross in situ
(‘000 tons)
  Total in situ
(‘000 tons)
Top Seam (TS)                
Block OC1    570       416   674    607
Block OC2    373      691   1,023    920
Block UG   1,076   936   1,497   1,347
Total TS   2,019    2,043   3,194   2,874
Bottom Seam (BS)                
Block OC1    567      669   1,143   1,029
Block OC2   1,227    1,595   2,505   2,254
Block UG    280      336        587    529
Total BS    2,074    2,600   4,235   3,812
     
Total Measured Resource    6,686
of which:    
Total Open Pit    4,810
Total Underground      1,876
     

Notes, assumptions and modifying factors:
- OC =  Open Cast
- UG = Underground
- Raw relative density (RD) values are laboratory tested. The average RD for the 2008 boreholes was assumed for all the boreholes since the historic boreholes had no RD values.
- Quality cut-off parameters for resource calculation was applied as low volatile areas (Vols < 5%) were excluded.
- Areas where the seam thickness is below 0.5 m were omitted.
- Geological losses of 10% were assumed.
- All tonnages and qualities are quoted air dry.

* The lack of laboratory capacity and drill rig availability have caused delays in the drilling programs on Boschhoek/ Boschkloof and Burnside, which are now expected to be completed in the next four weeks.

* Exploration at the The Boschhoek/ Boschkloof and Burnside projects is intended to upgraded the coal resource status to that of Measured from the current Indicated and Inferred Resource category. These CPRs will be issued as soon as possible after completion of drilling activities

* Miranda intends to begin the mining right application process on its three Glencoe properties (Uithoek, Boschhoek/ Boschkloof and Burnside) during the fourth quarter of 2008.

* Production remains on track to commence in the fourth quarter of 2008 at the Sesikhona Kliprand project, subject to the timely issue of the mining permit.

(1) The CPR was prepared by Mr PC Meyer (Pr.Sci.Nat 400025/03) a SAMREC-registered Competent Person.  PC Meyer has more than 18 years experience in the South African coal industry and is a member of the GSSA and Fossil Fuel Foundation.

 

ENDS

ISSUED BY:  FDBeachhead
Louise Brugman;
011 214 2415/ 083 504 1186/ louise.brugman@fd.com
Senzi Dlamini
011 214 2420 / 073 494 0030 / senzi.dlamini@fd.com

ON BEHALF OF:         Miranda Minerals
CEO: Ron Nel
012 665 4200

 